Project · Industrial
SINOHYDRO – Riyas Project
Supply, testing and commissioning of a UL/FM approved Fairbanks fire pump set, rated 500 GPM at 115 psi, for Sinohydro’s Riyas Project in Jubail.

- Location
- Jubail, Saudi Arabia
- End user
- Sinohydro
- Scope
- Supply · Testing · Commissioning
- Brand
- Fairbanks
Overview
A listed fire pump set for an industrial site
The brief
Industrial sites in Jubail need fire water that is ready around the clock, in heat and dust. The project called for a UL/FM approved fire pump set, tested and commissioned on site so it responds the moment the network calls for water.
Our scope
Supply, testing and commissioning of a UL/FM approved fire pump set, 500 GPM @ 115 psi (Fairbanks).
What we delivered
A complete, listed fire pump set
Supplied as one package, then tested and commissioned on site by our team.
- 01
Main fire pump
Rated 500 GPM at 115 psi to feed the site’s fire water network.
UL/FM approved
- 02
Jockey pump
Holds the network at pressure and makes up small losses, so the main pump only runs for a real demand.
Pressure maintenance
- 03
Fire pump controller
Starts the main pump automatically when system pressure drops and shows its status at a glance.
Automatic start

Tested, then commissioned
Before handover the set is run on site: the pump is started on demand, its flow and pressure are checked against the rated duty, and the controls are proven.
- UL/FM approved fire pump set
- Rated 500 GPM @ 115 psi
- Tested and commissioned on site
Delivery
From supply to a warranted handover
Step 1: Supply
The UL/FM approved Fairbanks fire pump set, delivered as a complete package.
Step 2: Testing
Set run and checked against the manufacturer's recommendations and the design requirements.
Step 3: Commissioning
Pump started at its rated duty and handed over ready for service.
Step 4: Warranty
Commissioned by us, so the supplied equipment stays eligible for warranty service.
Project photos
On site
The fire pump set on site in Jubail. Select a photo to view it full size.
More projects
Delivering results across every project

115/13.8 kVSubstation pump systems
115/13.8 kV Substation – Aramco Stadium
Dammam
Supply, testing and commissioning of booster pump sets, transfer pumps and submersible pumps (pumps and control panels) by Grundfos and Calpeda.

1000 GPM @ 8 barUL/FM fire pump set
Al Mana General Hospital
Jeddah
Supply, installation and commissioning of one UL/FM approved SPP fire pump set, 1000 GPM @ 8 bar.

Grundfos NK & TPChilled-water pumps
GCC Lab
Dammam, Third Industrial City
Supply of chilled-water pumps, laser alignment and control panel modification (Grundfos pumps, models NK & TP).
Request a quote
Complete water & electricity systems, from one partner.
Tell us about your project: pumps, fire pump sets, control or distribution panels, or service work. Our team will get back to you with a quotation.