Project · Power & utilities
115/13.8 kV Substation – Aramco Stadium
Supply, testing and commissioning of booster pump sets, transfer pumps and submersible pumps, complete with control panels, for the 115/13.8 kV substation serving Aramco Stadium in Dammam.

- Location
- Dammam, Saudi Arabia
- End user
- Saudi Electricity Company (SEC)
- Scope
- Supply · Testing · Commissioning
- Brands
- Grundfos · Calpeda
Overview
Dependable water systems for a high-voltage substation
The brief
A high-voltage substation runs around the clock, and so do the water systems behind it: pressurised water for the facilities on site, transfer between storage tanks, and pumps that keep pits and sumps dry. Every set had to start reliably when called, with controls that are easy for the operator to read and maintain.
Our scope
Supply, testing and commissioning of booster pump sets, transfer pumps and submersible pumps (pumps and control panels) by Grundfos and Calpeda.
What we delivered
Three pump systems, one supplier
Each system supplied complete with its control panel, then tested and commissioned by our team.
- 01
Booster pump sets
Keep the on-site water network at a steady pressure as demand changes.
Pumps + control panel
- 02
Transfer pump sets
Move water between storage tanks and supply points on the site.
Pumps + control panel
- 03
Submersible sump pumps
Drain water that collects in pits and sumps, keeping below-grade areas dry.
Pumps + control panel

Built for substation duty
For Saudi Electricity Company substations we supply pumps with a sun shade and NEMA 4X control panels, protecting equipment and controls from sun, dust and weather on outdoor sites.
- Sun shade over the pump set
- NEMA 4X-rated control panels
- Pumps and panels from one supplier
Delivery
From supply to a warranted handover
Step 1: Supply
Grundfos and Calpeda pumps with their control panels, matched to each duty.
Step 2: Testing
Each installation checked against the manufacturer's recommendations and the design requirements.
Step 3: Commissioning
Sets started up, set to their duty points and handed over to the operator.
Step 4: Warranty
Commissioned by us, so the supplied equipment stays eligible for warranty service.
Project photos
On site
Equipment supplied and commissioned for the substation. Select a photo to view it full size.
More projects
Delivering results across every project

1000 GPM @ 8 barUL/FM fire pump set
Al Mana General Hospital
Jeddah
Supply, installation and commissioning of one UL/FM approved SPP fire pump set, 1000 GPM @ 8 bar.

Grundfos NK & TPChilled-water pumps
GCC Lab
Dammam, Third Industrial City
Supply of chilled-water pumps, laser alignment and control panel modification (Grundfos pumps, models NK & TP).

500 GPM @ 115 psiUL/FM fire pump set
SINOHYDRO – Riyas Project
Jubail
Supply, testing and commissioning of a UL/FM approved fire pump set, 500 GPM @ 115 psi (Fairbanks).
Request a quote
Complete water & electricity systems, from one partner.
Tell us about your project: pumps, fire pump sets, control or distribution panels, or service work. Our team will get back to you with a quotation.