115/13.8 kV Substation – Aramco Stadium

Supply, testing and commissioning of booster pump sets, transfer pumps and submersible pumps, complete with control panels, for the 115/13.8 kV substation serving Aramco Stadium in Dammam.

Aramco Stadium in Dammam, home of the 115/13.8 kV substation project
Location
Dammam, Saudi Arabia
End user
Saudi Electricity Company (SEC)
Scope
Supply · Testing · Commissioning
Brands
Grundfos · Calpeda

Overview

Dependable water systems for a high-voltage substation

The brief

A high-voltage substation runs around the clock, and so do the water systems behind it: pressurised water for the facilities on site, transfer between storage tanks, and pumps that keep pits and sumps dry. Every set had to start reliably when called, with controls that are easy for the operator to read and maintain.

Our scope

Supply, testing and commissioning of booster pump sets, transfer pumps and submersible pumps (pumps and control panels) by Grundfos and Calpeda.

What we delivered

Three pump systems, one supplier

Each system supplied complete with its control panel, then tested and commissioned by our team.

  1. 01

    Booster pump sets

    Keep the on-site water network at a steady pressure as demand changes.

    Pumps + control panel

  2. 02

    Transfer pump sets

    Move water between storage tanks and supply points on the site.

    Pumps + control panel

  3. 03

    Submersible sump pumps

    Drain water that collects in pits and sumps, keeping below-grade areas dry.

    Pumps + control panel

Pump set and control panel inside a protective enclosure

Built for substation duty

For Saudi Electricity Company substations we supply pumps with a sun shade and NEMA 4X control panels, protecting equipment and controls from sun, dust and weather on outdoor sites.

  • Sun shade over the pump set
  • NEMA 4X-rated control panels
  • Pumps and panels from one supplier

Delivery

From supply to a warranted handover

  1. Step 1: Supply

    Grundfos and Calpeda pumps with their control panels, matched to each duty.

  2. Step 2: Testing

    Each installation checked against the manufacturer's recommendations and the design requirements.

  3. Step 3: Commissioning

    Sets started up, set to their duty points and handed over to the operator.

  4. Step 4: Warranty

    Commissioned by us, so the supplied equipment stays eligible for warranty service.

Project photos

On site

Equipment supplied and commissioned for the substation. Select a photo to view it full size.

Request a quote

Complete water & electricity systems, from one partner.

Tell us about your project: pumps, fire pump sets, control or distribution panels, or service work. Our team will get back to you with a quotation.

Project details

We use your details only to reply to your request. Privacy policy