Skip to content

Project · Healthcare

Al Mana General Hospital

Supply, installation and start-up of one UL/FM approved SPP fire pump set, rated 1000 GPM at 8 bar, for Al Mana General Hospital in Jeddah.

Al Mana General Hospital building in Jeddah
Location
Jeddah, Saudi Arabia
End user
Al Mana
Scope
Supply · Installation · Start-up
Brand
SPP

Overview

Fire protection a hospital can rely on

The brief

A hospital cannot simply empty its wards, so its fire protection has to work the moment it is called on. The sprinkler and hydrant network needed a fire pump set that is listed for the duty, starts on demand and keeps delivering its rated flow.

Our scope

Supply, installation and commissioning of one UL/FM approved SPP fire pump set, 1000 GPM @ 8 bar.

What we delivered

A complete, listed fire pump set

Supplied as one package, then installed and started up on site by our team.

  1. 01

    Main fire pump

    Rated 1000 GPM at 8 bar to feed the hospital’s fire water network.

    UL/FM approved

  2. 02

    Jockey pump

    Holds the network at pressure and makes up small losses, so the main pump only runs for a real demand.

    Pressure maintenance

  3. 03

    Fire pump controller

    Starts the main pump automatically when system pressure drops and shows its status at a glance.

    Automatic start

Electric fire pump controller with its operator panel and instructions plate

Listed for fire duty

UL/FM approval means the pump set has been tested and certified by Underwriters Laboratories and FM Approvals for fire protection service, the standard that insurers and civil defence authorities look for.

  • UL/FM approved fire pump set
  • Rated 1000 GPM @ 8 bar
  • Installed and started up by our team

Delivery

From supply to a warranted handover

  1. Step 1: Supply

    The UL/FM approved SPP fire pump set, delivered to site as a complete package.

  2. Step 2: Installation

    Set positioned, connected to the fire water network and wired to its controller.

  3. Step 3: Start-up

    Pump started, run at its rated duty and checked before handover.

  4. Step 4: Warranty

    Commissioned by us, so the supplied equipment stays eligible for warranty service.

Project photos

On site

The SPP fire pump set, its controllers and installation. Select a photo to view it full size.

Request a quote

Complete water & electricity systems, from one partner.

Tell us about your project: pumps, fire pump sets, control or distribution panels, or service work. Our team will get back to you with a quotation.

Project details

We use your details only to reply to your request. Privacy policy