Supply of Grundfos NK and TP chilled-water pumps, laser alignment and control panel modification for the GCC Lab in Dammam’s Third Industrial City.

GCC Safety & Fire Testing Lab building in Dammam
Location
Dammam, Third Industrial City, Saudi Arabia
End user
GCC
Scope
Supply · Laser alignment · Panel modification
Brand
Grundfos

Overview

Chilled-water pumps, aligned for efficiency

The brief

Chilled-water pumps run for long hours to keep a laboratory’s cooling stable, so small losses add up. The client needed new pumps supplied, their motor and pump shafts precisely aligned, and the existing control panels adapted to run them.

Our scope

Supply of chilled-water pumps, laser alignment and control panel modification (Grundfos pumps, models NK & TP).

What we delivered

Pumps, alignment and controls, one team

Every part of the job handled by our engineers, so the plant runs as designed.

  1. 01

    Chilled-water pumps

    Grundfos NK end-suction and TP in-line pumps for the chilled-water circuit.

    Grundfos NK & TP

  2. 02

    Laser alignment

    Motor and pump shafts brought onto one centreline with laser measurement, cutting vibration, wear and energy loss.

    Precision alignment

  3. 03

    Control panel modification

    Existing control panels modified to suit and run the new pumps.

    Controls

Engineer fitting laser alignment equipment to a pump motor

Laser alignment on site

When the motor and pump shafts are not on one centreline, the coupling, bearings and seals absorb the difference with every revolution. Laser alignment measures that error precisely and brings both shafts back into line.

  • Lower energy use
  • Longer bearing and seal life
  • Less vibration and noise
About our laser alignment service

Delivery

From supply to a warranted handover

  1. Step 1: Supply

    Grundfos NK and TP pumps selected for the chilled-water circuit.

  2. Step 2: Alignment

    Each pump and motor laser-aligned, with readings recorded before and after.

  3. Step 3: Controls

    Control panels modified to run the new pumps.

  4. Step 4: Handover

    Pumps checked in operation and handed over to the client.

Project photos

On site

Pump supply and laser alignment at the lab. Select a photo to view it full size.

Request a quote

Complete water & electricity systems, from one partner.

Tell us about your project: pumps, fire pump sets, control or distribution panels, or service work. Our team will get back to you with a quotation.

Project details

We use your details only to reply to your request. Privacy policy